The grid is a queue. We are not.
A gigawatt of new compute is planned every eleven days. A grid interconnection clears in four to seven years. That gap is not a forecast problem — it is a physics problem, and physics does not negotiate with waitlists.
So we inverted the model: generation, storage, and switchgear on 53-foot trailers. Convoyed to the load. Paralleled on arrival. At rated output in 32 seconds. Power goes where the work is.
Cold trailer to rated load. Timed from breaker command to full output.
Per microgrid block. Gensets, storage, and switchgear on a single bus.
CO₂e versus equivalent diesel fleets. Third-party verified.
Measured availability. Trailing twelve months, at the meter.
Four trailer classes. One machine. Every unit rolls on a standard semi chassis, lands on a common bus, reports to one dispatch controller. Add trailers, add megawatts.
GENERATION
Lean-burn reciprocating gensets in acoustic enclosures, built for block loads that would stagger a turbine.
- 3.2 MW per trailer, paralleled to 200+ MW
- Rated load in 32 seconds from cold start
- 44% electrical efficiency, lean-burn NOx control
STORAGE
Trailer-mounted batteries bridge demand steps and hold the bus while engines catch up.
- 5.6 MWh per trailer, 2.8 MW continuous
- Sub-100 ms transient response
- LFP chemistry, 8,000-cycle design life
SWITCHGEAR
The mobile paralleling bus that turns a lot full of trailers into one power plant.
- 15 kV-class bus, 64 sources per segment
- Auto-synchronization in under 4 seconds
- Grid-parallel or fully islanded
FUEL
Virtual pipeline logistics deliver spec-grade gas anywhere a truck can reach.
- CNG and field-gas capable, 900–1,400 BTU/scf
- Onboard conditioning to pipeline spec
- 72-hour onsite reserve
THREE MOVES. NO SUBSTATION. NO WAIT.
DEPLOY
Twelve trailers roll on public highways and stage on compacted grade. No cranes, no foundations. Pad to power in six days.
SYNCHRONIZE
Paralleling switchgear locks every unit to a single bus, phase-matched. Rated load in 32 seconds.
POWER
Steady state at 99.99% availability for AI campuses, industry, and grid support. Need forty more megawatts? Add trailers.
STRANDED GAS, PUT TO WORK
Every year an estimated 140 billion cubic meters of field gas burns in flares — energy spent lighting the sky. DYNAMO routes it through lean-burn gensets into compute instead, tracked by fleet-wide emissions telemetry sampled every five seconds.
Power, answered.
Tell us the load, the coordinates, and the date. The convoy handles the rest.